User Tools

Site Tools


2013-08-21_meeting_notes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
2013-08-21_meeting_notes [2013/08/22 21:52] mhatz2013-08-21_meeting_notes [2013/11/27 20:27] – remove next meeting date mhatz
Line 22: Line 22:
 ==== Roadmap for mail2voice V1 (stable release) ==== ==== Roadmap for mail2voice V1 (stable release) ====
  
-  * Code cleaning (estimated 1 weeks)+  * Code cleaning (estimated 1 week)
     * Translation of the source code from french to english.     * Translation of the source code from french to english.
     * More comments (!)     * More comments (!)
   * Code refactoring (estimated 2 weeks)   * Code refactoring (estimated 2 weeks)
-  * Code documentation, will be published on the wiki. (estimated 1 weeks)+  * Code documentation, will be published on the wiki. (estimated 1 week)
   * Implementation of the missing features (see below, listed on the bugtracker too) (estimated 1 month)   * Implementation of the missing features (see below, listed on the bugtracker too) (estimated 1 month)
   * Evaluation and integration of a free vocal synthesis engine (like eSpeak) (estimation 1 week ??)   * Evaluation and integration of a free vocal synthesis engine (like eSpeak) (estimation 1 week ??)
Line 53: Line 53:
  
   * A mailing list should be created. Laurent will see if it can be doable with sourceforge.   * A mailing list should be created. Laurent will see if it can be doable with sourceforge.
- 
- 
-Next meeting is planned for week 37. 
- 
- 
2013-08-21_meeting_notes.txt · Last modified: 2023/04/25 16:52 by 127.0.0.1